Wall distribution, cooling, orientation and moisture affect size. Identify critical features instead of applying one tolerance to every surface.
Required
Depowder and blast
Excavation removes the powder cake; blasting clears adhering powder and evens the grain. Both operations can stress fine pins and flexures.
Confirm: blast media/pressure, protected details, channel cleanliness and whether loose powder is allowed internally.
Colour
Dye a compatible substrate
Dye penetrates a near-surface region rather than turning the full wall into one colour. Powder, pretreatment and colour all affect the result.
Confirm: named material, approved colour/texture sample, scratch exposure and final dimensions after the dye cycle.
Surface
Smooth with a validated route
Vapour or chemical smoothing modifies the polymer surface and may improve cleanability or appearance. It also softens edges and text.
Confirm: material compatibility, internal access, edge retention, fit, sealing and any regulated cleaning requirement.
Interface
Machine, tap or coat where needed
Reaming or machining can create a functional seat; coatings add build. The part needs a datum and enough local stock or wall thickness.
Confirm: workholding, machining allowance, coating thickness, masking and inspection in the final conditioned state.
DyeMansion reports about 0.2 mm dye penetration for EOS PA 2200 on its DM60 process; this is not a universal depth for every nylon or dye route.