Manufacturing quotes
in seconds, not days.
Upload your CAD. We extract geometry, suggest materials, and price your part instantly — CNC, 3D printing, sheet metal, and injection molding, on one screen.
No credit card. No sales call. Get a price in under a minute.
Real 3D viewer. Real geometry analysis.
STEP, IGES, STL, or SolidWorks — drop it in and we render it in-browser, extract bounding box, mass, volume, and feature density, and surface per-face inspection tools (tap-a-hole, counterbore, critical dimension, per-face finish). The price meter starts moving before you pick a material.

3D viewer with multi-axis presets, zoom controls, and per-face inspection tools.
Five processes. Specs carry over.
Started on CNC? Switch to 3D printing mid-design — material, tolerance, finish, and quantity follow you where the engineering makes sense. Sheet Metal and Injection Molding live in the same configurator under the same chrome, so your buyers never have to learn a second tool.

Process switcher — CNC, Sheet Metal, 3D Printing, Injection Molding in a single popover.
One RFQ. Every part. One submit.
Drop one part for a prototype or 50 for production. Each line has its own material, tolerance, finish, and quantity, but they ship as a single RFQ — one PO, one invoice, one delivery. The cart sidebar stays open while you configure each part so you never lose context.

Five-part cart with rendered thumbnails — Manifold Holder, Shim Sheet, Shaft Coupler, and more.
Every RFQ, order, and shipment in one place.
Quotes flow into the Projects hub the moment you submit. Status, qty, line price, and progress (Quoting → Quoted → Ordered → In Production → QC Passed → Shipped → Delivered) all in one row. Search by project no., part name, or price. KPI cards roll up active projects, items in production, payment due, and lifetime spend.

Projects dashboard with KPI cards and per-project status timeline.
Message the engineer running your quote.
Replace your supplier email chain with a focused thread. Quote updates, lead-time revisions, and shipping confirmations land in the same Inbox as the FabDigit team's direct messages. Categorize by Quotes, Orders, Shipments, Invoices, Quality, or System events — read everything in one screen.

Inbox with categorized filters and a live conversation with the FabDigit team.
Ready to quote your part?
Drop a CAD, get a price. No login wall.
