Every deadline.
One timeline.

Quote response SLAs, production milestones, shipping ETAs, payment dues — all on a single program-manager-grade Gantt. Drag to replan, subscribe to your calendar, sleep at night.

iCal and Google Calendar subscribe links per project.

01
Unified timeline

Four lifecycles. One view. Real dependencies.

Quote → PO → Production → QA → Ship → Pay isn’t a linear thing in real life. Schedule renders all four streams as parallel lanes on the same Gantt so you see, at a glance, that the part you ship next Tuesday depends on a quote you haven’t signed off yet. The dependency arrows make the cascade explicit.

Gantt view — Quote / Production / Shipping / Payment lanes with dependency arrows between milestones.

02
Roll-ups

See the program. Drill to the part.

Top level: one row per project, fully-collapsed timeline showing the "window" of all activity. Click to expand: per-line items, per-milestone dates, per-supplier handoff points. Same Gantt, three altitudes of detail — no separate dashboards to switch between.

Project row collapsed (top) and expanded to 5 per-part milestone tracks (bottom).

03
Filter and subscribe

Slice by supplier, status, or date. Export to your calendar.

Filter chips: this week, this project, this supplier, only late, only mine. iCal feed per filter — paste the URL into Google Calendar, Outlook, or Apple Calendar and your phone reminds you about the SLA without opening a browser tab.

Top filter row with chips and a "Subscribe to .ics" link that copies a per-filter feed URL.

04
Deadline alerts

Nudges before SLAs slip. Not after.

Schedule watches for milestones drifting against their plan and pings you in Inbox before they’re overdue — "Supplier response window for RFQ #4218 closes in 18h, no quote received." Email / mobile push optional. Late-once shame loop, gone.

Inbox preview — proactive Schedule alert "RFQ response window closes in 18h" with one-click "extend SLA" / "nudge supplier" actions.

05
Replan mode

Drag a milestone. Watch the cascade.

Slip a production date by two days; Schedule recomputes the shipping ETA, payment due date, and dependent quote-deadline rows live, in-place, before you commit. Compare scenarios side-by-side, then ship the plan with one click. No more "what if" spreadsheet.

Replan mode — production bar dragged right, downstream rows ghost their old position with delta badges showing the cascade.

Your factory runs on dates. So should your workspace.

Sign in to see your live timeline and subscribe to your project calendar.